Technical Session A5:  Waterway Structures

Technical Session A5:  Waterway Structures
Moderator:  Eddie Brauer
A5.1:  Accelerating Planning Through Standardization and Digital Project Processing Using the Example of Labyrinth Weirs (Gabriele Peschken)
A5.2:  Major Structural & Operational Improvement of a Quay Wall in a Container Terminal Remaining in Operation (Michel Zeicher)
A5.3:  Portland Canal Guide Wall Damage Repair Design-Build Project, Louisville, Kentucky (Zach Usselton)
A5.4:  Standardized Replacement Mitering-Type Lock Gates on the McClellan-Kerr Arkansas River System (Gary Grunwald Jr.)
A5.5:  Kentucky Lock Downstream Approach Wall Challenges and Innovations (Mojtaba Dirbaz)

 