| Technical Session A5: Waterway Structures Moderator: Eddie Brauer |
| A5.1: Accelerating Planning Through Standardization and Digital Project Processing Using the Example of Labyrinth Weirs (Gabriele Peschken) |
| A5.2: Major Structural & Operational Improvement of a Quay Wall in a Container Terminal Remaining in Operation (Michel Zeicher) |
| A5.3: Portland Canal Guide Wall Damage Repair Design-Build Project, Louisville, Kentucky (Zach Usselton) |
| A5.4: Standardized Replacement Mitering-Type Lock Gates on the McClellan-Kerr Arkansas River System (Gary Grunwald Jr.) |
| A5.5: Kentucky Lock Downstream Approach Wall Challenges and Innovations (Mojtaba Dirbaz) |
Event Timeslots (1)
Wednesday | 10 September
-
Location - RM 103
Smart Rivers