| Technical Session B3: Hydraulic Structures Operations and Maintenance Moderator: Jim Marino |
| B3.1: Welland Canal Steel Mitre Gates – Structural Rehabilitation/Replacement Program (Mario Palumbo) |
| B3.2: Sustainable Smart Sheet Pile Solutions for Inland Waterways (Pierre Werner) |
| B3.3: Taming Outdraft Conditions at Mississippi River’s Lock & Dam 7 (Geoff Kramer) |
| B3.4: The Project for a Second Lock at Fontinettes (Olivier Vermorel) |
| B3.5: Designing the Proposed 1200′ Lock at LaGrange Lock and Dam (Brain Twitchell) |
Event Timeslots (1)
Wednesday | 10 September
-
Location - RM 104
Smart Rivers