Technical Session B3:  Hydraulic Structures Operations and Maintenance

Technical Session B3:
Hydraulic Structures Operations and Maintenance
Moderator: Jim Marino
B3.1:  Welland Canal Steel Mitre Gates – Structural Rehabilitation/Replacement Program (Mario Palumbo)
B3.2:  Sustainable Smart Sheet Pile Solutions for Inland Waterways (Pierre Werner)
B3.3:  Taming Outdraft Conditions at Mississippi River’s Lock & Dam 7 (Geoff Kramer)
B3.4:  The Project for a Second Lock at Fontinettes (Olivier Vermorel)
B3.5:  Designing the Proposed 1200′ Lock at LaGrange Lock and Dam (Brain Twitchell)

 

Event Timeslots (1)

Wednesday | 10 September
-
Location - RM 104
Smart Rivers Smart Rivers

Scroll to Top
Skip to content